Buying brief
Evidence on this desk, framed as a purchase checklist - not SEBI-registered advice.
As of 29 Oct 2026
Stance
Fit for a long SIP
Evidence supports keeping this on a shortlist for a multi-year equity SIP.
In three lines
Fits if · Peak-to-trough drawdown has stayed shallower than 15%.
Buy checklist
History depth
Pass
5.0 years of path to read.
Engine status
Pass
Evidence supports keeping this on a shortlist for a multi-year equity SIP.
Expense ratio
Pass
0.25% TER (Direct). Lower cost compounds on long SIPs.
Drawdown vs peers
Pass
Peak-to-trough -3.5%. Ask whether you can hold through a similar fall.
Vs category
Fail
2% of rolling 3Y windows beat the category median, same plan and option.
Manager tenure
n/a
Manager not listed.
Exit load
n/a
No exit-load summary on file.
Tax / wrapper
Pass
Direct Growth, no ELSS lock flagged. Equity LTCG rules still apply after one year - not tax advice.
Portfolio concentration
Watch
Top 10 holdings ≈ 63.8% of the portfolio.
Evidence supports a shortlist - confirm with peers before you buy elsewhere.
Behaviour and wrappers - the usual India MF failure modes - not a buy instruction.
Drawdown rehearsal
This scheme’s worst fall on file is about 4%. Before you SIP, ask whether you would keep contributing through a similar drop - pausing on fear is the usual India MF failure mode.
SIP discipline
If you start a SIP here, diary a 90-day check and an annual review - don’t react to every NAV print.
NAV
Path not in current snapshots
n/a
Trailing CAGR and simulated monthly SIP XIRR from daily NAV. Category comparison uses the median of comparable share classes in the peer set.
Trailing CAGR
Point-to-point, calendar-day annualized
SIP XIRR
Equal monthly instalments to latest NAV
Peak to trough from a running NAV high, with the path and recovery episodes.
Drawdown
Path not in current snapshots
n/a
31 Mar 2022 – 13 Sept 2022
Trough 6 May 2022 · recovered in 130 days
-3.5%
13 Sept 2022 – 11 Nov 2022
Trough 26 Sept 2022 · recovered in 46 days
-1.4%
15 Dec 2021 – 11 Feb 2022
Trough 2 Feb 2022 · recovered in 9 days
-0.9%
28 Feb 2022 – 28 Mar 2022
Trough 9 Mar 2022 · recovered in 19 days
-0.6%
0–100 reads of named metrics. The mean is unweighted and only uses dimensions with data.
Returns
57
Vs category
100
Consistency
21
Risk-adjusted
34
Drawdown
91
Mean
61
Quantitative engine reasons behind the buying stance. An explanation can only restate what is already here.
Buying stance
Fit for a long SIP
Evidence supports keeping this on a shortlist for a multi-year equity SIP.
Why this status
Supporting reads
30 Sept 2026 · 31 holdings · top 10 are 63.8%.
STATE DEVELOPMENT LOAN 30214 GUJ 31MR27 6.58 FV RS 100
Industrials
10.6%
INDIAN OIL CORPORATION LIMITED SR XXI 6.14 LOA 18FB27 FVRS10LAC
Energy & Utilities
9.6%
Indian Railway Finance Corporation Ltd SR-118 Bonds 7.83 21/03/2027
Financial
8.2%
Power Finance Corporation Ltd SR-164 Bonds 7.75 22/03/2027
Financial
7.2%
Power Grid Corporation of India Ltd SR-LVIII Bonds 7.89 09/03/2027
Energy & Utilities
5.3%
DECISION
Status moved from MONITOR to HEALTHY.
22 Sept 2026
DECISION
Status moved from HEALTHY to MONITOR.
8 Sept 2026
Same-category peers with enough history to inspect beside this fund - including tradeoffs.
DSP Mutual Fund
Caveat: Lower trailing returns
Edelweiss Mutual Fund
Caveat: Lower trailing returns
Kotak Mahindra Mutual Fund
Caveat: Lower trailing returns
Nippon India Mutual Fund
Caveat: Lower trailing returns
Bandhan Mutual Fund
Caveat: Higher volatility · Deeper drawdown
Buying brief
Evidence on this desk, framed as a purchase checklist - not SEBI-registered advice.
As of 29 Oct 2026
Stance
Fit for a long SIP
Evidence supports keeping this on a shortlist for a multi-year equity SIP.
In three lines
Fits if · Peak-to-trough drawdown has stayed shallower than 15%.
Buy checklist
History depth
Pass
5.0 years of path to read.
Engine status
Pass
Evidence supports keeping this on a shortlist for a multi-year equity SIP.
Expense ratio
Pass
0.25% TER (Direct). Lower cost compounds on long SIPs.
Drawdown vs peers
Pass
Peak-to-trough -3.5%. Ask whether you can hold through a similar fall.
Vs category
Fail
2% of rolling 3Y windows beat the category median, same plan and option.
Manager tenure
n/a
Manager not listed.
Exit load
n/a
No exit-load summary on file.
Tax / wrapper
Pass
Direct Growth, no ELSS lock flagged. Equity LTCG rules still apply after one year - not tax advice.
Portfolio concentration
Watch
Top 10 holdings ≈ 63.8% of the portfolio.
Evidence supports a shortlist - confirm with peers before you buy elsewhere.
Behaviour and wrappers - the usual India MF failure modes - not a buy instruction.
Drawdown rehearsal
This scheme’s worst fall on file is about 4%. Before you SIP, ask whether you would keep contributing through a similar drop - pausing on fear is the usual India MF failure mode.
SIP discipline
If you start a SIP here, diary a 90-day check and an annual review - don’t react to every NAV print.
NAV
29 Oct 2026 · +5.7% over 1Y
13.4907
Trailing CAGR and simulated monthly SIP XIRR from daily NAV. Category comparison uses the median of comparable share classes in the peer set.
Trailing CAGR
Point-to-point, calendar-day annualized
SIP XIRR
Equal monthly instalments to latest NAV
Peak to trough from a running NAV high, with the path and recovery episodes.
Drawdown
29 Oct 2026
0.0%
31 Mar 2022 – 13 Sept 2022
Trough 6 May 2022 · recovered in 130 days
-3.5%
13 Sept 2022 – 11 Nov 2022
Trough 26 Sept 2022 · recovered in 46 days
-1.4%
15 Dec 2021 – 11 Feb 2022
Trough 2 Feb 2022 · recovered in 9 days
-0.9%
28 Feb 2022 – 28 Mar 2022
Trough 9 Mar 2022 · recovered in 19 days
-0.6%
0–100 reads of named metrics. The mean is unweighted and only uses dimensions with data.
Returns
57
Vs category
100
Consistency
21
Risk-adjusted
34
Drawdown
91
Mean
61
Quantitative engine reasons behind the buying stance. An explanation can only restate what is already here.
Buying stance
Fit for a long SIP
Evidence supports keeping this on a shortlist for a multi-year equity SIP.
Why this status
Supporting reads
30 Sept 2026 · 31 holdings · top 10 are 63.8%.
STATE DEVELOPMENT LOAN 30214 GUJ 31MR27 6.58 FV RS 100
Industrials
10.6%
INDIAN OIL CORPORATION LIMITED SR XXI 6.14 LOA 18FB27 FVRS10LAC
Energy & Utilities
9.6%
Indian Railway Finance Corporation Ltd SR-118 Bonds 7.83 21/03/2027
Financial
8.2%
Power Finance Corporation Ltd SR-164 Bonds 7.75 22/03/2027
Financial
7.2%
Power Grid Corporation of India Ltd SR-LVIII Bonds 7.89 09/03/2027
Energy & Utilities
5.3%
DECISION
Status moved from MONITOR to HEALTHY.
22 Sept 2026
DECISION
Status moved from HEALTHY to MONITOR.
8 Sept 2026